Palomar Medical Center West: A Look Ahead

Palomar Medical Center West – Proposed Campus
(450 beds):
Hospital - 750,000 sq. ft.

  • 168 Acuity Adaptable beds
  • 192 Med/Surg beds
  • 12 Operating Rooms 
  • 6 Cath. Labs. / Interventional
  • Radiology Rooms
  • 48 E.D. Exam/Tx + 2 Trauma Rooms
  • 17 Imaging Rooms 

Three month look ahead

 

  • Activities through 2007
    • Rock crushing, blasting of rock
    • Selection of concrete contractor
    • Detailing for foundations (reinforcing steel, rock anchors and anchor bolts)
    • Steel mill order
    • Complete hospital basement excavation
    • MEP systems fully coordinated in BIM model (Basement through Level 3)
       

Entire project look ahead

 

  • Major Milestones
    • Steel erection July 2008
    • MEP overhead rough-in December 2008
    • Drywall (non-priority) begins April 2009
    • Steel topping off July 2009
    • Tower roof complete March 2010
    • Tower weather-tight March 2010
    • Building energized March 2010
      Elevators ready to use April 2010
    • Central plant ready to occupy Fall 2010
    • Hospital ready to occupy early 2012


Womens & Childrens Hospital –150,000 sq. ft.
(date of project and build to be determined)

  • 20 LDR / Ante-Partum Rooms
  • 44 Post-Partum Beds
  • 16 Pediatric Beds
  • 16 NICU Beds
  • 3 Operating Rooms

 

©2010 Palomar Pomerado Health | PH: 1.800.628.2880
Join Palomar Pomerado Health on  
Media Player graphic banner
Media Player Interface Graphic
Media Player Interface Graphic

 

Media Player Interface Graphic
Media Player Interface Graphic
Media Player Interface Graphic
Media Player Interface Graphic

FlashControl

Please specify the MovieUrl property for the location (URL) of the movie to display.

Media Player Interface Graphic
Media Player Interface Graphic
Media player interface graphic space